Hunan Haohua Chemical Co., Ltd.
Environmental Protection for the Completion of the Salt Residue Comprehensive Utilization Project
inspection
Receive
Capital
material
Construction Unit: Hunan Haohua Chemical Co., Ltd.
Prepared by: Hunan Jingxiu Environmental Protection Technology Co., Ltd.
Two 〇 Two One year Eight month
Table of Contents
One Self-Inspection Report of the Enterprise for Completion Environmental Protection Acceptance Monitoring
Two Environmental Protection Acceptance Monitoring Report upon Completion
III. Other Explanations
Self‑Inspection Report on Environmental Protection for the Completion of the Salt Slag Comprehensive Utilization Project of Hunan Haohua Chemical Co., Ltd.
Construction Entity: Hunan Haohua Chemical Co., Ltd.
Survey Date: August 2021
1 Project Overview
1.1 Project Overview
Investment by Hunan Haohua Chemical Co., Ltd. 501.4 Comprehensive utilization of sulfonation centrifugal sludge generated in the insecticide‑active‑ingredient workshop, with a capacity of ten thousand yuan (no external sources will be accepted). According to the environmental impact assessment and approval for the salt‑slag comprehensive utilization project of Hunan Haohua Chemical Co., Ltd., this project will not involve the construction of new buildings or structures, nor will it require additional land; the newly added major production equipment will be installed within the existing premises. 2# Production is carried out in the insecticide‑single workshop, while the raw material warehouse, finished‑product warehouse, and other auxiliary facilities are all integrated into the existing infrastructure. Upon completion, the project will be capable of annually processing a total amount of salt residue. 5000t/a , annual production of brick and tile antifreeze 3775t/a (Actual production capacity is determined based on the enterprise’s processing volume of sulfonation centrifugal waste residue; product composition test reports are provided in the appendix.) 10 ).
Table 1.1-1 Project Construction Overview Table
|
Category |
Basic Information |
|
Project Name |
Salt Residue Comprehensive Utilization Project |
|
Construction entity |
Hunan Haohua Chemical Co., Ltd. |
|
Legal Representative |
Yan Ziguì |
|
Nature of the Project |
Expansion |
|
Construction Site |
Yuwang Road, Youzhou Industrial Park, You County, Zhuzhou City, Hunan Province 1 Number, with the central geographic coordinates being east longitude 113°18'00" , north latitude 27°00'36" |
|
Industry Category and Code |
Chemical pesticide manufacturing |
|
Building (structure) area |
Total land area 2511m2 |
|
Production scale |
Design for annual processing of waste salt residue 5000t/a , capable of producing antifreeze annually 3775t/a。 |
|
Number of employees |
Labor staffing for this project 9 The personnel will be sourced from within the plant’s internal dispatch system, with no new hires. |
|
Annual working hours |
Annual working days 300 Days, annual production hours are 7200 Hours, production operates on a four-shift, two‑shift system, with each shift… 12 Hourly work system. |
|
Actual investment situation ( Ten thousand yuan ) |
Total investment: 501.4 Ten thousand yuan, of which: Secondary Environmental protection investment 4.93 Ten thousand yuan, Secondary Proportion of environmental protection investment in total investment: 0.98% 。 |
|
Construction period |
2021 year 1 Monthly commencement, 2021 year 2 month Completion |
2 Status of Environmental Compliance Procedures
Environmental Impact Assessment Report for the Comprehensive Green Relocation and Upgrade Project of Hunan Haohua Biological Products Co., Ltd. at 2019 year 3 Monthly commission Hunan Baohua Environmental Protection Co., Ltd. Completed compilation , and also 2019 year 4 month 16 The date was approved by the Hunan Provincial Department of Ecology and Environment. Xiang Environmental Impact Assessment [ 2019 ] 17 Number , the project was initiated in 2019 year 10 month 31 Passed acceptance on the same day; Environmental Impact Report for the Comprehensive Utilization Project of Salt Residue at Hunan Haohua Chemical Co., Ltd. at 2020 year 1 Monthly commission Hunan Jingxin Environmental Protection Technology Co., Ltd. Prepared, and on 2021 year 1 month 26 The approval was issued by the Zhuzhou Ecological Environment Bureau on [date]. Plant Environmental Impact Assessment [ 2021 ] 2 Number ) 。 According to the approval document, the enterprise is no longer required to purchase the full volume of discharge permits (as its original permit had a surplus); however, since the discharge permit did not cover the production line for the comprehensive utilization of salt slag, the enterprise has re-applied for a discharge permit (see attachment). 4 ) 。 This project involves the comprehensive utilization of hazardous waste. The environmental risks faced by the enterprise have not undergone any significant changes; therefore, no revision to the emergency response plan is required (Emergency Response Plan Filing No.: 430223-2019-040-H ).
3 Self-Inspection of Project Construction Status
3.1 Project Construction Content
Corporate investment 527.3 Comprehensive utilization of sulfonation centrifugation sludge generated in the insecticide‑dichlorvos workshop (no external sources will be accepted). This project will not involve the construction of new buildings or structures, nor will it require additional land; the newly added major production equipment will be installed within the existing facilities. 2# Production is carried out in the insecticide‑single workshop, while the raw material warehouse, finished‑product warehouse, and other auxiliary facilities are all integrated into the existing infrastructure. Upon completion, the project will be capable of annually processing a total amount of salt residue. 5000t/a , annual production of brick and tile antifreeze 3775t/a (Actual production capacity is determined based on the enterprise’s processing volume of sulfonation centrifugal sludge.)
Table 3.1-1 Comparison Table of Project Construction Contents
|
Project |
Environmental Impact Assessment Status |
Actual situation |
Note |
|
|
Project Scale |
Annual processing of waste salt residue 5000t/a , capable of producing antifreeze annually 3775t/a |
Consistent with the environmental impact assessment. |
/ |
|
|
Total project investment |
527.3 Ten thousand yuan |
501.4 Ten thousand yuan |
Includes investment in repurposed assets. |
|
|
Main Project |
Project production relies on 2# Insecticide single‑batch workshop, with a floor area of 945m2, A salt‑slag comprehensive utilization facility is being installed in the idle area on the east side of the workshop, with the main equipment being a refining kettle. 3 Tai, condenser 3 Taiwan, centrifuge 3 Tai etc. |
Project production relies on 2# Insecticide single‑batch workshop, with a floor area of 945m2, A salt‑slag comprehensive utilization facility is being installed in the idle area on the east side of the workshop, with the main equipment being a refining kettle. 3 Tai, condenser 3 Taiwan, centrifuge 2 Taiwan |
Since the centrifuge manufacturer has been changed, the centrifuge capacity has increased and its processing efficiency has improved, thereby meeting production requirements; consequently, the number of centrifuges has been reduced. 1 Taiwan |
|
|
Auxiliary Engineering |
The waste salt residue used in the project is classified as hazardous waste and is temporarily stored in the plant’s solid waste storage facility, which has been constructed in accordance with the requirements for hazardous waste storage facilities, with an area of… 126m2。 |
Consistent with the environmental impact assessment. |
/ |
|
|
The freeze‑proofing agents produced by the project are stored in the completed finished‑goods warehouse located on the north side of the plant site, with a floor area of 1440m2。 |
Consistent with the environmental impact assessment. |
/ |
||
|
Office Life |
Relying on the R&D and Quality Inspection Building and the Comprehensive Building, the R&D and Quality Inspection Building in total… 3 The floor has been completed; the comprehensive building comprises 4 Layer, under construction. |
Consistent with the environmental impact assessment. |
/ |
|
|
Utilities |
Water supply |
Relying on the park’s water supply network, the park’s water distribution system has been connected to the plant premises. |
Consistent with the environmental impact assessment. |
/ |
|
Drainage |
Wastewater is treated at the plant’s existing wastewater treatment station and then discharged via a dedicated pipeline into the park’s sewage network. It subsequently enters the park’s wastewater treatment plant for advanced treatment before being released into the Mi River. |
Consistent with the environmental impact assessment. |
||
|
Power supply |
Adopt 1 road 10kV Dedicated power supply incoming line and 1 road 10kV Emergency power supply; the power has been connected within the plant area. |
Consistent with the environmental impact assessment. |
||
|
Heating supply |
It is supplied by the park’s centralized heating system. |
Consistent with the environmental impact assessment. |
||
|
Environmental Engineering |
Waste gas treatment |
1 , the process‑related exhaust gases, after being collected by the newly constructed exhaust gas collection system, are routed to… 2# Insecticide Monomer Workshop Exhaust Gas Treatment System (Primary Water Spray) + Level 1 Alkali spray ) Processing 2 Waste gas from wastewater treatment is handled by the existing waste gas collection and treatment system at the wastewater treatment plant (after closed‑system collection, it undergoes primary alkaline scrubbing). + Photocatalysis + Biological spray treatment |
Consistent with the environmental impact assessment. |
/ |
|
Wastewater treatment |
Relying on the existing wastewater treatment plant at the plant site, the primary treatment process is catalytic micro-electrolysis. +LBQ-ABR Anaerobic treatment +LBQ Aerobic reaction + Catalytic oxidation, designed treatment capacity 1500m3/d。 |
The project’s production wastewater is treated at the company’s existing wastewater treatment plant, using the catalytic micro‑electrolysis process. + Fenton oxidation +ABR1+SBR1+ABR2+SBR2+ Denitrification + Coagulation and sedimentation: After the wastewater meets discharge standards, it is conveyed to the Yuxian High-Tech Industrial Development Zone Wastewater Treatment Plant for advanced treatment. Wastewater discharged from the plant complies with the “Integrated Wastewater Discharge Standard.” ( GB 8978-1996) It meets the Class III standard and complies with the influent water quality limits of the development zone’s wastewater treatment plant. |
/ |
|
|
Solid waste treatment |
Relying on the existing facilities at the plant site Solid waste storage facility, The area is 126m2。 |
Consistent with the environmental impact assessment. |
/ |
|
|
Noise Processing |
The major noise-generating equipment is installed indoors, with measures such as foundation vibration isolation, sound attenuation, and sound insulation implemented. |
Consistent with the environmental impact assessment. |
/ |
|
3.2 Main raw and auxiliary materials
The changes in the consumption of the project’s major raw and auxiliary materials are shown in the table below.
Table 3.2-1 Overview of the Project’s Raw and Auxiliary Materials and Energy Consumption
|
Serial number |
Name |
Annual consumption for environmental impact assessment ( t/a ) |
Actual consumption ( t/a ) |
Note |
|
|
Original salt residue |
Newly generated salt sludge |
||||
|
1 |
Sulfonated centrifugal waste residue |
5000 |
960.63 |
850.57 |
The actual consumption is 2021 year 2 From the start of monthly trial production to 5 month 31 Daily consumption. |
|
2 |
Hydrogen peroxide |
500 |
145.14 |
150.86 |
|
|
3 |
Fresh water |
10860 |
2086.48 |
1847.44 |
|
|
4 |
Steam |
6083.55 |
1168.81 |
1034.90 |
|
|
5 |
Electricity |
64.28 Ten thousand kW.h |
12.35 |
10.93 |
|
Note: The original salt residue refers to the salt sludge generated since the enterprise began trial production. 2019 year 7 month -2021 year 1 month), the newly generated salt sludge refers to the salt sludge produced by the enterprise since the start of trial production for the salt‑sludge comprehensive utilization project ( 2021 year 2 month -5 Since the start of trial production, a total of brick and tile antifreeze has been produced. 1234.201 t . The relevant circumstances have been reported to the competent authorities.
4 Self-Inspection of Environmental Protection Facility Construction
4.1 Exhaust gas
( 1 ) Production process exhaust gas
This project’s salt residue primarily contains sodium chloride, moisture, dimethoate, sodium thiosulfate, and other components such as methanol, sodium sulfite, sodium bisulfite, and sodium sulfide. Methanol in the salt residue is readily soluble in water and highly susceptible to oxidation by hydrogen peroxide; therefore, most of the methanol entrained in the residue can be oxidized by hydrogen peroxide into carbon dioxide and water. During the oxidation process with hydrogen peroxide, the dimethoate present in the salt residue will produce… NH 3 Gaseous emissions. The waste gases generated in this project primarily originate from the production process and consist mainly of ammonia. NH 3 The production rate is 0.29kg/h , resulting in a concentration of 144mg/m3 . The enterprise has installed a reactor off-gas collection system to capture and centrally treat the project’s exhaust gases as much as possible, ensuring organized emissions. After collection, the project’s exhaust gases are routed to… 2# Insecticide waste gas treatment unit (primary water spray) + After treatment by first‑stage alkaline spray scrubbing, the effluent is discharged through a rooftop stack to an emission height of approximately… 15m。
( 2 ) Wastewater treatment and exhaust gas
The wastewater generated by this project primarily consists of process‑related effluent and rinse water from equipment and workshop cleaning. The wastewater will be treated at the plant’s existing treatment facility. During the treatment process, odorous pollutants such as hydrogen sulfide and ammonia may be produced. Utilizing the enterprise’s existing exhaust‑gas collection system, the gases will be captured in a closed loop and subjected to primary alkaline scrubbing. + Photocatalysis + After treatment by the biological spray device, it is discharged from 25m Emission from the exhaust stack, with an air flow rate of 17000 m 3/h . The wastewater quality of this project is similar to that of the existing facility, with an additional volume compared to the existing facility of 12462t/a , the increase is 3.45% , the increase is very small; therefore, the concentrations of all gaseous pollutants generated by the wastewater treatment plant remain essentially unchanged. 。
The waste gas pollutant control measures for this project are shown in the table below.
Table 4.11 Overview of Measures for the Control of Project Emission Pollutants
|
Serial number |
Types of pollutants |
Major pollutants Factor |
Governance measures |
Note |
|
1 |
Production process exhaust gas |
NH 3 |
After collection, the exhaust gas is treated by a primary water spray. + After the first‑stage alkaline spray treatment meets the standards, Through 1 root 15m External discharge from the exhaust stack |
Enterprise-based 2# The original exhaust gas treatment facility in the insecticide workshop. |
|
2 |
Wastewater treatment exhaust gas |
VOCs 、 Odor concentration, hydrogen sulfide, ammonia |
After being collected in a closed system, the exhaust gas is subjected to primary alkaline scrubbing. + Photocatalysis + After treatment by the biological spray device, it is discharged from 25m Emission from the exhaust stack. |
Relying on the enterprise’s existing wastewater treatment plant’s exhaust gas treatment facilities. |
4.2 Wastewater
The wastewater generated by this project primarily consists of condensate, filtrate, effluent from equipment and workshop cleaning, and periodic discharge from the circulating water station. It will be treated at the enterprise’s existing wastewater treatment facility. The main pollutants in the project’s wastewater are… Cash on Delivery 、 BOD , salt content, etc., In this project, the wastewater is first mixed with other high‑concentration effluents and conveyed to the plant’s central wastewater treatment station. After being blended with low‑concentration wastewater in a prescribed ratio, it enters the treatment process at the station. Once it meets the Class III standards of the Integrated Wastewater Discharge Standard and the influent design criteria of the park’s wastewater treatment plant, it is discharged into the park’s sewage network, sent to the park’s treatment facility for centralized treatment, and, upon compliance with discharge standards, released into the Mi River.
For details on the Environmental Protection Acceptance Report for the Comprehensive Utilization Project of Salt Residue at Hunan Haohua Chemical Co., Ltd., please call 0731-22969108. Thank you for your attention to Hunan Haohua, and we wish you every success in your work!